








Men's recycled work trousers
from €33,56 + VAT*
*customization not included
📦 The more you buy, the more you save
All calculations are for reference only. Minimum quantity: 10 pieces
10 itemsUnit price: €
After selecting the product and quantity, send your quote request. Within 48 hours, you will receive our offer by email.
Approximately 10–15 working days from quote confirmation.

WK743
60% cotton, 40% recycled polyester
310 gsm
Regular
Washing at 60 °C. Straight cut. 2 front pockets (bag pocket in the main fabric), 1 of which has a small pocket. 2 pleated cargo pockets, detached from the pants at the lower corners, with flap and velcro closure, one of which has 2 compartments and spaces for tools; pen pocket on the right side. 2 pleated back pockets with flap and velcro closure, hammer holder on the left. Comfort foam on the knees integrated into a contrasting Cordura® pocket (black for all colors). Contrasting stretch insert (except for black) on the crotch and behind the knees for increased durability and maximum freedom of movement. Cordura® insert at the leg bottom with silver piping and adjustable hem of 5 cm. Triple stitching at the center back and front. Double stitching on the sides and crotch. Waistband with plastic ring + adjustable belt loops thanks to an elastic. Wide loop on the back side of the waistband. Closure with button and zip (metal button covered in plastic). Removable brand name label. Sold without accessories.
Wash with similar colors at a maximum of 60°, do not iron on the print, wash and iron inside out.
You may also like
Some questions we often get:
Discover the most frequently asked questions from our customers. Still have questions? Contact our support team.
Is there a minimum order quantity?
In this section dedicated to B2B customers, the minimum order quantity is 10 pieces, even with mixed products, sizes, and colors.
How does pricing work?
Prices are structured in quantity tiers, with more advantageous conditions as volumes increase.
What are the production times?
Average production times are approximately 10 working days, unless otherwise specified during the quotation phase.















